Preparatory Work Before Use The Cooling Tower(3)
Jun 17, 2017

1.Check that whether the nozzle orientation of the water distribution system,clean it if need.

2.Check the circulating water pump,adjust the water flow according to the design value.Open the valve on the drain pipe,adjust the flow of water to the recommended flow.

3.Check the insulation resistance of the industrial cooling tower motor,avoid burning the motor when running.Turn off the switch and power cut to avoid the turning of fan hurt people, and check whether the power supply and current circuit breaker are in the rated range.

4.Review whether the installation site of all parts is accord with installation requirements,whether the fasteners are loose,in particular, the driver system parts must be tightened securely,all pull rods should be tightened and have regulation margin.