Home > News > Content
Cooling Tower Location Installation
Dec 15, 2018

Choosing the right cooling tower installation location is designed to allow the cooling tower to enter the unit freely and unobstructed in fresh air and to ensure maximum backflow. In the design phase, focus on space constraints, surrounding buildings, existing units, adjacent buildings, dominant wind directions, pipelines, and possible future expansion plans. Once you have mastered this information, you can choose the best installation location for the sewage cooling tower. Specific precautions:

1. Usually, the cooling towers in the factory are installed on the roof or other building floors with sufficient carrying capacity, because it has good ventilation effect and can better help the cooling tower to dissipate heat.

Note: During installation, the minimum distance between the air inlet of the cooling tower and the building should be no less than 1.5 times the outer diameter of the tower. This can meet the requirements of the new wind inlet tower and avoid installation in the high-wall without ventilation.

2. When a cooling tower cannot meet the production requirements, more cooling towers need to be installed. At this time, it is necessary to pay attention to the spacing between each cooling tower to ensure smooth ventilation;

3. The selection of the installation position of the cooling tower must pay attention to whether there are places with soot or dust around, avoid installing in these places, and prevent the film from being blocked by soot and dust;

4. At the time of installation, if there is a hot place such as a kitchen or other boiler room, the address should be re-selected. These places are prone to generate heat, which causes the cooling tower itself to dissipate heat and have poor cooling capacity.